Mission Module
#
Design Capture: Follow the instructions below to build the Wildfire project using Sedaro Satellite's Mission ModuleStep 1: Create and name your first project. This project can be cloned or deleted.
Project Explorer - Create a New Project
Step 2: Create and name your first project version. This project version can be cloned or deleted. After saving the new project version name, open the Mission Module shown in the navigation panel.
Project Explorer - Create a New Branch
Step 3: Under the Orbit & Time Segment input orbit and time parameters
Orbit and Time Segment
Step 4: Under the Targets Segment select the "plus" sign to add Targets
Targets Segment
Step 4.1: Uplink ground station target at Sedaro HQ
Sedaro HQ Coordinates
Step 4.2: Laser Comm Relay Satellite Targets (4 Space Targets)
LC Relay Targets
Step 4.3: Add active wildfire imaging targets (12 Ground Targets)
Wildfire Location Targets
Step 4.4: Add the Sun as a Celestial target
Sun Target
Step 4.5: Add a target group
Target Group
Step 4.6: Add relay constellation target group
Relay Constellation Target Group
Save Relay Constellation Target Group
Step 4.7: Add active wildfire imaging target group
Active Wildefire Imaging Target Group
Active Wildefire Imaging Target Group
Step 5: Open the Spacecraft Dialog
Spacecraft Dialog
Step 5.1: Add a custom CAD Model or use a preset model
Add custom CAD model
Step 5.2: Add/Save Imager Body Frame Vector
Add Imager Body Frame Vector
Save Imager Body Frame Vector
Step 5.3: Add/Save Max Power Body Frame Vector
Max Power Body Frame Vector
Step 5.4: Add/Save Min Drag Body Frame Vector
Min Drag Body Frame Vector
Step 5.5: Add/Save Antenna Max Gain Body Frame Vector
Antenna Body Frame Vector
Step 5.6: Verify and Save Body Frame Vectors
Save Body Frame Vectors
Step 6: Add Pointing Modes
Add Pointing Modes
Step 6.1: Add Crosslink Pointing Mode
Add Crosslink Pointing Mode
Step 6.2: Add Uplink Pointing Mode
Add Uplink Pointing Mode
Step 6.3: Add Min Drag Link Pointing Mode
Add Min Drag Link Pointing Mode
Step 6.4: Add Max Power Pointing Mode
Add Max Power Pointing Mode
Step 6.5: Add Imaging Pointing Mode
Add Imaging Pointing Mode
Step 7: Add Conditions
Add Conditions
Step 7.1: Condition for Maximum Off-Nadir Imaging angle
Add Max Off-Nadir Condition
Step 7.2: Condition for Line of Sight to a Crosslink Satellite
Add Line of Sight to a Crosslink Satellite Condition
Step 7.3: Condition for Eclipse State
Add Eclipse State Condition
Step 7.4: Condition for Satellite Elevation from Ground Station
Add Satellite Elevation from Ground Station Condition
Step 8: Add Operational Modes
Op Modes
Step 8.1: Add Uplink Operational Mode
Uplink Op Mode
Step 8.2: Add Imaging Operational Mode
Imaging Op Mode
Step 8.3: Add Crosslink Operational Mode
Crosslink Op Mode
Step 8.4: Add Idle Sunlight Operational Mode
Idle Sunlight Op Mode
Step 8.5: Add Idle Eclipse Operational Mode
Idle Eclipse Op Mode
Step 8.6: Review Operational Mode Priorities. Click and drag Op Modes to match the priority list shown below.
Set Op Mode Priority
Step 9: Simulate your project by selecting the "Simulate" button in the navigation panel.
Simulate Project
Step 10: Select the Analyze boards in the navigation panel to view the simulation results and 3D Playback View.